{"id":1576,"date":"2015-05-27T11:43:15","date_gmt":"2015-05-27T09:43:15","guid":{"rendered":"https:\/\/dessin-project.eu\/?p=1576"},"modified":"2015-06-02T09:11:05","modified_gmt":"2015-06-02T07:11:05","slug":"important-dessin-milestones-achieved","status":"publish","type":"post","link":"https:\/\/dessin-project.eu\/?p=1576","title":{"rendered":"Important DESSIN milestones achieved"},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-thumbnail wp-image-1577\" src=\"https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS13-150x150.png\" alt=\"MS13\" width=\"150\" height=\"150\" srcset=\"https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS13-150x150.png 150w, https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS13-300x300.png 300w, https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS13.png 609w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/>Two important DESSIN milestones (MS) have been completed at the DESSIN demo sites in Athens and Hoffselva.<\/p>\n<p>MS13: Integrated system architecture design has been completed for the <a href=\"https:\/\/dessin-project.eu\/?page_id=38\" target=\"_blank\">Athens<\/a> case study on November 2014 by NTUA and has served to the purchase of equipment and instruments of the pilot site. See thumbnail picture to the left.<\/p>\n<p><!--more Click to see more--><\/p>\n<p>M14: Instrumentation and monitoring equipment has been installed in <a href=\"https:\/\/dessin-project.eu\/?page_id=42\" target=\"_blank\">Hoffselva<\/a> during April and May 2015 by Inrigo, LKI and SINTEF. The instrumentation will be used to measure and log water quality both prior to and after treatment. See picture below.<\/p>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1578\" src=\"https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS14-300x167.png\" alt=\"MS14\" width=\"500\" height=\"279\" srcset=\"https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS14-300x167.png 300w, https:\/\/dessin-project.eu\/wp-content\/uploads\/2015\/05\/MS14.png 803w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two important DESSIN milestones (MS) have been completed at the DESSIN demo sites in Athens and Hoffselva. MS13: Integrated system architecture design has been completed for the Athens case study on November 2014 by NTUA and has served to the purchase of equipment and instruments of the pilot site. See thumbnail picture to the left.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/posts\/1576"}],"collection":[{"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1576"}],"version-history":[{"count":7,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/posts\/1576\/revisions"}],"predecessor-version":[{"id":1587,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=\/wp\/v2\/posts\/1576\/revisions\/1587"}],"wp:attachment":[{"href":"https:\/\/dessin-project.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dessin-project.eu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}