Please subscribe to our Newsletter

D32.1 Design criteria and documentation of performance for local CSO overflow treatment

D32.1 Design criteria and documentation of performance for local CSO overflow treatment
  • Version Final
  • Download 580
  • File Size 1,98 MB
  • File Count 1
  • Create Date March 1, 2018
  • Last Updated March 1, 2018
  • Download

D 32.1. is the final report on Demonstration Tests of High Rate Filtration (HRF) system and Cross-Flow Lamella Settler (CLS) in Hoffselva, Oslo.


FileAction
D32.1 Design criteria and documentation of performance for local CSO overflow treatment.pdfDownload