D32.1 Design criteria and documentation of performance for local CSO overflow treatment

D32.1 Design criteria and documentation of performance for local CSO overflow treatment
  • Final Version
  • 9 Download
  • 1,98 MB File Size
  • 1 File Count
  • March 1, 2018 Create Date
  • March 1, 2018 Last Updated

D 32.1. is the final report on Demonstration Tests of High Rate Filtration (HRF) system and Cross-Flow Lamella Settler (CLS) in Hoffselva, Oslo.


FileAction
D32.1 Design criteria and documentation of performance for local CSO overflow treatment.pdfDownload